Fix the heat tracing cable on the pipe with self adhesive glass cloth tape.
Raychem heat trace cable installation.
This manual covers the installation of raychem xl trace self regulating heating cables and con nections for commercial construction pipe systems in ordinary nonhazardous areas.
Do not use metal attachments vinyl electrical tape or duct tape as heating cable damage may result.
Our available heat trace products are designed for flexibility offering self regulating power limiting mineral insulated and longline cables.
1 4 heating cable attachment recommendations.
Wintergard roof clip roof clip bracket kits used to secure wintergard wet trace heating cables in roof and gutter de icing applications.
The heating cable may be installed straight spiralled or in multiple runs as required by the design specification or raychem product literature.
Factory mutual approved for use in class i division 2 groups b c and d.
Class iii division 2 areas.
The manual cov ers general heating cable installation procedures and specific installation details and shows available connection kits for the different applications.
Do not clamp the heating cable with the support but place the heating cable over the support.
Always make sure that your installation is thermally insulated and weatherproofed according to the requirements of your particular application.
Class ii division 2 group g.
Heating cables design guide and installation details for self regulating heating cable the rscc 2700 self regulating heat ing cable is available with either a tinned copper or stainlesssteel over shield.
For connection and termination of nvent raychem wintergard self regulating trace heating cables heat shrink power connections and cold applied end seals.
Also learn more about our monitoring products and connected solutions for virtually any application.